CNOOC International has a 24.5% working interest in the Hassi Bir Rekaiz project, located onshore in northeastern Algeria, alongside partners SONATRACH (51%) and PTT Exploration and Production Public Company Limited (24.5% and operator).
CNOOC International has a 24.5% working interest in the Hassi Bir Rekaiz project, located onshore in northeastern Algeria, alongside partners SONATRACH (51%) and PTT Exploration and Production Public Company Limited (24.5% and operator).
- A terminal treatment plant
- The first natural gas treatment plant in Iraq
- A fresh water treatment plant
- An oily wastewater treatment plant
- A 110 megawatt power plant
- A 55 kilometre gathering trunk line
- A 53 kilometre crude oil transmission pipeline
In 2014, the oil transfer pipelines for the Missan Oil Fields commenced production, with a daily transport capacity of 500,000 barrels of crude oil.
Uncovering treasures from the past
Learn more about our culture of safety and sustainability
-
CNOOC Uganda supports local scholarship program
Read more: CNOOC Uganda supports local scholarship program -
Guyana Petroleum Conference
Read more: Guyana Petroleum Conference -
Payara Commenced Production
Read more: Payara Commenced Production -
Mero 1 Commenced Production
Read more: Mero 1 Commenced Production
How we practice safety every day
Our commitment to sustainability
Working with us